Adding a chain link fence to your property is one of the most cost-effective ways to enhance security, define boundaries, and keep pets or children safe. While it might look like a complex industrial project, it is a very manageable DIY task if you follow the right sequence.

Using the official guidelines from the Chain Link Fence Manufacturers Institute, (Step by Step Installation Guide) we’ve broken down the process into eight clear steps to help you achieve a professional-grade result.

Preparation & Tools

Before you dig your first hole, you need to gather your gear. Here is what you’ll need:

Essential Tools

  • Post Hole Digger: For precise, deep footings.
  • Level: Critical for keeping posts “plumb” (perfectly vertical).
  • Mason’s Line & Stakes: To ensure your fence is straight.
  • Fence Stretcher: A ratchet-type puller or block and tackle for tightening the fabric.
  • Hacksaw or Pipe Cutter: For trimming the top rails.
  • Concrete Mixing Tools: Wheelbarrow, shovel, and hoe.

Pro-Tip: Check Before You Dig

Always check local building codes and contact your local utility company to mark underground lines. Additionally, it is recommended to set your posts 4 inches inside your property line to avoid encroaching on your neighbor’s land with the concrete foundations.

Step 1: Survey and Layout

Start by stretching a string line along your desired fence path. Mark the locations of your terminal posts (ends, corners, and gate posts). For gates, remember to account for the hardware:

  • Walk Gates: Add 3 3/4″ to the gate width for hinges and latches.
  • Double Drive Gates: Add 5 1/5″ for hardware.

Step 2: Set the Terminal Posts

Dig your terminal post holes. A general rule of thumb is a minimum depth of 24 inches for a 4-foot fence (add 3 inches of depth for every additional foot of height).

  • The Concrete Mix: Use a 1-2-4 ratio (1 part cement, 2 parts sand, 4 parts gravel).
  • Shape Matters: Ensure the hole is wider at the bottom than the top to prevent “frost heave” from pushing the post out of the ground.
  • Height: Terminal posts should be set 2 inches higher than the width of the fence fabric.

Step 3: Set the Line Posts

Once terminal posts are set, stretch a mason’s line between them to align your line posts.

  • Spacing: Line posts should generally be spaced no more than 10 feet apart.
  • Height: Line posts should be set 2 inches lower than the fabric width (to allow the top rail to sit at the correct height).

Step 4: Apply Fittings

After the concrete has set:

  1. Slip tension bands onto the terminal posts (usually 4 per post for a standard height, spaced 10–12 inches apart).
  2. Add brace bands and terminal post caps.
  3. Ensure all bolt heads are on the outside of the fence for a cleaner look and better security.

Step 5: Install the Top Rail

Attach loop caps to the line posts. Feed the top rail through these caps. If your fence is long, join rail sections using the swedged (tapered) ends. The rail ends will eventually be bolted into the rail end fittings on your terminal posts.

Step 6: Hang the Fabric

Unroll the chain link fabric on the ground along the outside of the fence line.

  1. Slide a tension bar through the first row of diamonds in the fabric.
  2. Attach the bar to the terminal post using the tension bands you installed in Step 4.
  3. Walk the fabric up and lean it against the framework, loosely securing it to the top rail with a few ties.

Step 7: The Big Stretch

This is the most critical step. Using a fence stretcher, pull the fabric toward the opposite terminal post.

  • The Tension Test: The fabric is tight enough when it “gives” only slightly when squeezed by hand.
  • Securing: Once tight, insert another tension bar, attach it to the terminal bands, and remove the excess fabric by “unscrewing” a single wire link.
  • Final Ties: Secure the fabric to the top rail and line posts with aluminum tie wires every 18 inches.

Step 8: Hang the Gate

Finally, install your gate hinges.

  • Security Trick: Install the top male hinge upside down. This prevents someone from simply lifting the gate off its hinges.
  • Align the top of the gate with the top of the fence and tighten all bolts securely.

Conclusion

By following these steps, you ensure that your fence isn’t just a barrier, but a structural addition to your home that will last for decades. For more detailed measurements and charts, always refer to the specific spacing guides provided by your manufacturer. Happy building!

Follow CLFMI

CONGRATULATIONS TO THE 2024-2025 LES GRUBE DESIGN AWARD WINNER!​

Submit Your Entry to Les Grube Design Award

Products/Service Locator

Learn About the Benefits of CLFMI Membership

Scroll to Top